B-Four: 4 Phase Production Separator

B-Four Overview

Production Separators have the full ability to separate and effectively measure gas, oil, water, and solids.

BOLD’s 4 phase production separators are built on a containment skid and trailer mounted with the ability to remove the asset from the trailer for permanent applications. Our vessels range from 30” to 94” OD and 150# to 2,000# in size and have fully flanged versus threaded pipe.

The Bold Advantage

Trailer Mounted with Containment Pans

Safety Features

  • Annual UT/PSV Recertification Program
  • Pressure Relief Valves with In-Service Test Device
  • High/Low Level Switches
  • Pressure Pilots
  • Telemetry Package (Optional)

Mobile Design/Value Adds

  • Trailer Mounted with Containment Pans
  • Advanced Engineered Internals for Effective Separation
  • Redundant Dumps, Redundant Fuel Gas Trains, Manifold Systems

Operations/Engineering

  • Complimentary Start up and commissioning services
  • 24/7/365 field service support/troubleshooting
  • PFD and engineering support
  • Performance curves available

Mobile Design

  • Skid and Trailer Mounted; 53’ Double Drop King Pin Trailer

Safety Features:

  • High/Low Level Switches
  • Pressure Pilots
  • Pressure Relief Valves with In-Service Test Device

Complete Process Piping Including:

  • Redundant Dumps
  • Redundant Fuel Gas Train

Measurement Equipment:

  • 4” V-Cone Gas Measurement – Senior Meter Run
  • 2” Liquid Turbine Meters with Full Bypasses

Mobile Design

  • Skid and Trailer Mounted; 53’ Double Drop King Pin Trailer

Safety Features:

  • High/Low Level Switches
  • Pressure Pilots
  • Pressure Relief Valves with In-Service Test Device

Complete Process Piping Including:

  • Redundant Dumps
  • Redundant Fuel Gas Train

Measurement Equipment:

  • 4” V-Cone Gas Measurement – Senior Meter Run
  • 2” Liquid Turbine Meters with Full Bypasses

Mobile Design

  • Skid and Trailer Mounted; 53’ Double Drop King Pin Trailer

Safety Features:

  • High/Low Level Switches
  • Pressure Pilots
  • Pressure Relief Valves with In-Service Test Device

Complete Process Piping Including:

  • Redundant Dumps
  • Redundant Fuel Gas Train

Measurement Equipment:

  • 4” V-Cone Gas Measurement – Senior Meter Run
  • 2” Liquid Turbine Meters with Full Bypasses

Mobile Design

  • Skid and Trailer Mounted; 32’ Gooseneck Trailer

Safety Features:

  • High/Low Level Switches
  • Pressure Pilots
  • Pressure Relief Valves with In-Service Test Device

Complete Process Piping Including:

  • Redundant Dumps
  • Redundant Fuel Gas Train
  • Built in Manifold System (co-mingling)

Measurement Equipment:

  • 4” V-Cone Gas Measurement – Senior Meter Run
  • 2” Liquid Turbine Meters

Mobile Design

  • Skid and Trailer Mounted; 32’ Gooseneck Trailer

Safety Features:

  • High/Low Level Switches
  • Pressure Pilots
  • Pressure Relief Valves with In-Service Test Device

Complete Process Piping Including:

  • Redundant Dumps
  • Redundant Fuel Gas Train

Measurement Equipment:

  • 2” V-Cone Gas Measurement
  • 2” Liquid Turbine Meters

Mobile Design

  • Frac Tank Style Trailer

Safety Features:

  • High/Low Level Switches
  • Pressure Pilots
  • Pressure Relief Valves with In-Service Test Device

Complete Process Piping Including:

  • Redundant Dumps
  • Redundant Fuel Gas Train

Measurement Equipment:

  • 4” V-Cone Gas Measurement
  • 3” Liquid Turbine Meters